OEM Off-Highway magazine Editor Chad Elmore has given Republic of Mining.com permission to post an October 2007 article on Sudbury’s Mining Supply and Service sector.
OEM Off-Highway magazine provides an editorial mix of new technology, component information, engineering processes and industry news to help product development teams design and produce better off-highway vehicles and component systems. OEM Off-Highway
The Northern Bermuda Triangle
Today CVRD Inco is still involved in product development, albeit in a different capacity. Most of the equipment in Sudbury leaves the factory fully assembled. If it’s going to be lowered in a cage, a few tricks must be performed. Depending on the size of the cage, this can mean tearing the machine down, lowering the pieces on the cage and rebuilding it underground. It’s an extra process that can cost the mine as much as $30,000.
CVRD Inco wanted to prove new machines above ground. It created a ramp with a 20% grade in an old open pit mine near Sudbury.
It’s been called the Bermuda Triangle of the North because things happen to vehicles on the ramp test that never occurred in the past. The vehicles are pounded repeatedly by worst-possible situations that replicate real-world conditions. The Canadian Standards Assoc. (CSA) and other groups spell out specifications like safe stopping distances. CVRD Inco’s test uses the standards, then cuts them by a third to make up for extended maintenance intervals.